The Intermodal project is at 64% complete, on schedule and within budget. Project highlights to date include the completion of the curtain wall spanning the length of the skywalk, installation of escalators at the TEI and the connection of the east and west garages over the train tracks.
Mechanical, electrical, and plumbing installation continues at the terminal end. Overhead piping and roof drains continue to be installed as well. Glass curtain wall installation on the TEI bridge is over 90% complete. The stair tower is ready for exterior metal panels. Escalator units are being delivered to the site and lowered into the building by use of a crane. The elevator bays are now prepped and ready for the elevator units to be installed. All masonry work at the terminals end is complete.